Scripts for Ep 2-5 almost done

Posted: 29th July 2008 by Travis Thomsen in 1-800-Tech-Support

Over last week Matthew and I have been working episodes 2-5. Things are coming along rather nicely. Last night I spent a good a mount of time going over Ep 2, 3 and 4 making revisions. I finally had to stop myself after midnight. I should be done with my changes to ep 5 by tonight.

On a side note. I registered the domain for 1800techsupport.net as well as a MySpace page. Both sites are rather barren but there will be more to come.

You must be logged in to post a comment.